Search:
Producers: 76 Designers: 66 714 Number of CAD drawings: 166 009

The roof KS1000RW

Drawings

D3.1.Kalenica sided

D27.1.Wentylator Ridge

D4.1.Attyka the gable roof ridge

D47.1.Płotek Snow

D5.2.Attyka double in the top of the

D5.1.Attyka single in the top of the

D26.2.Zmiana inclination of roof

D26.1.Zmiana inclination of roof

D25.7.1.Okno Velux roof on prefabricated basis - a combination of upper and lower

D25.6.2.Naświetle of prefabricated foundation - the connection side

D25.7.2.Okno VELUX Roof on prefabricated base - connection side

D25.8.1.Naświetle VELUX roof based on prefabricated - a combination of upper and lower

D25.8.2.Naświetle VELUX roof based on prerfabrykowanej - connection side

D6.1.Attyka in the eaves of the prefabricated insulated gutter

D7.1.Rynna Eaves

D9.5. Rounded eaves gutter without connection to the board RW ukł.pionowym

D9.4. The curved eaves of the roof gutter insulated connection with the wall in ukł.pionowym

Kingspan - The roof KS1000RW - KS1000RW dwg

KS1000RW

Recommended spacing of fasteners

Tiling

D9.3.Zaokrąglona single ridge

D9.2.Okap rounded with a prefabricated wall of the gutter - horizontally

D8.1.Rynna międzypołaciowa

D7.3.Rynna Eaves

D8.2.Rynna międzypołaciowa - tiling membrane

D8.3.Rynna międzypołaciowa - coated membrane lining

D9.1.Okap rounded with a prefabricated wall of the gutter - vertically

D25.6.1.Naświetle of prefabricated foundation - a combination of upper and lower

D25.5.2.Przejście duct through the roof - connection side

D16.1.Połączenie masonry wall with roof - perpendicular to the slope

D15.7.Połączenie roof and wall TF vertical - parallel to the descent

D17.1.Połączenie masonry wall with roof - parallel to the slope

D20.1.Dylatacja

D21.1.Przejście-combustion duct through the roof

D15.6.Połączenie roof and wall TF horizontally - parallel to the descent

D15.1.Połączenie wall - parallel to the roof slope

D1.1.Kalenica

D11.1.Połączenie boards to length

D14.10.Połączenie roof and walls of the vertically-laid TF - perpendicular to a decrease in

D14.1.Połączenie wall - roof perpendicular to the slope

D14.9.Połączenie roof and wall TF laid horizontally - perpendicular to drop

D2.1.Szczyt

D22.1.Przejście duct through the roof

D25.4.1.1.Okno roof PRIMA FENESTRA based on aluminum - a combination of upper

D25.3.2.Naświetle of prefabricated foundation - the connection side

D25.4.1.2.Okno roof PRIMA FENESTRA based on aluminum - a combination of lower

D25.4.2.Okno roof PRIMA FENESTRA based on aluminum - the connection side

D25.5.1.Przejście duct through the roof - a combination of upper and lower

D25.3.1.Naświetle of prefabricated foundation - a combination of upper and lower

D25.2.2.Naświetle of prefabricated foundation - the connection side

D24.1.Świetlik - side perpendicular to the ridge

D23.1.Świetlik - side parallel to the ridge

D25.1.1.Naświetle of prefabricated foundation - a combination of top and bottom

D25.1.2.Naświetle of prefabricated foundation - the connection side

D25.2.1.Naświetle of prefabricated foundation - a combination of top and bottom

D10.1.Złącze side plates

Contact

Kingspan
Greenfield Business Park No. 2 Greenfield, Holywell, Flintshire
CH8 7GJ North Wales
UK
tel. Phone, fax Fax
Tel: +44 (0)1352 716100
Fax: +44 (0)1352 710161
Email: info@kingspanbenchmark.com
Regulations | Contact